January 10 (Special Meeting)

Board of Education Meeting # 8 (Special)

January 10, 2007

Board Members present: Paul Bohac, Lois Corey, Don Mathews, Jeff Pugh,

Barb Sedelbauer, Bill Waughtal

Board Members absent: Ramie Bakken

Meeting convened at 4:35 p.m.

Brad Simonson distributed booklets and presented a building by building outline of the findings of the district facility study conducted by his firm, HSR and Associates.

Following his presentation and after extensive discussion of the existing sites and the efficiencies that could be generated by changes within the district, the board agreed to engage HSR in additional work and asked Brad to focus his efforts on three areas:

1. Study the feasibility of constructing a new high school or additions to the existing building on the green space located south of the existing high school

2. Study the feasibility of replacing two of the existing elementary schools with one new facility

3. Examine the possibility of relocating the district office to Gebhardt School.

Brad indicated that he could have preliminary findings completed within a month. He was directed to contact Dr. Richards to schedule a follow-up meeting.

The meeting adjourned at 6:35 p.m.

Website by SchoolMessenger Presence. © 2020 Intrado Corporation. All rights reserved.